Search Results
PLAN 5362. URBAN DIVERSITY. 3 Hours.
IE 5362. LOGISTICS & PRODUCTION PLANNING. 3 Hours.
The economic impacts of fluctuating demand, supply availability and production rates are examined via design and analysis of manufacturing and logistics systems. Emphasis is placed on reducing cycle time, increasing throughput, lowering variation, and improving both quality and customer responsiveness through modeling techniques. Prerequisite: Graduate standing.